OEE per station, mold and product changeover times, machine maintenance and energy consumption per product are read from linked records.
OEE is the product of availability, performance and quality; maintenance and Andon stops are taken as downtime.
Mold and product changeovers are recorded per station with the total time and the internal and external time split.
For the selected period the total kilowatt-hours and the kilowatt-hours per product are visible.
Four needs, four modules.
A work order per route step is generated from the plan; the operator selects the station and the active work order and enters production, scrap and downtime records. Stations that exceed capacity are separated out as bottlenecks.
See detailsWith SMED a changeover record is kept with the total time, the internal and external time split and a category; the summary and the station trend show how changeover times develop.
See detailsPeriodic maintenance is generated from a schedule and upcoming maintenance is reminded; per machine the maintenance cost and the mean time between failures are calculated.
See detailsEnergy meters send their measurements over HTTP; the cost by tariff and the quick CO₂ indicator are calculated, and consumption above the expected level is caught by an hourly scan.
See detailsChoose an area, enter your weekly hours and your hourly cost, and set the improvement you expect with the slider. The result is calculated only from the values you enter.
Choose an area and enter your hours, cost and expectation to see the result.
Time that could be recovered each week
hours
Monthly gross difference
A gross estimate that excludes the cost of Gemba, calculated only from the assumptions you enter.
Most frequently asked questions for plastic injection molding
Maintenance and Andon stops are taken as downtime; operations completed within the range are counted.
The SMED tool is in the lean production area; you record the changeover per station as a mold or product changeover.
Energy meters send their measurements over HTTP; the data is written to the measurement point and the indicators are calculated from these readings.
How does an order get to the shop floor, and at which step does it leave stock?
See the answerHow does a nonconformity you see on the shop floor turn into an improvement?
See the answerWho notices energy consumption above what is expected?
See the answerTell us about your processes and let's clarify together which module to start with.
We have your details; we will call you, taking your chosen time slot into account.
OEE, changeover, maintenance and energy records stay in the same structure.